When to put the doors when repairing: Nuances Installation

Anonim

Everyone knows that it is most convenient to carry out repair work in a summer period, since it is at this time that it is easier to fulfill the restructuring of the house, and the building materials are better adapted.

When to put the doors when repairing: Nuances Installation

The installation of interroom doors is better to produce in the summer.

When repairing has to solve various questions, and one of them - when it is better to install interroom doors - before repairing or after it.

When it is better to install doors

The interroom door consists of a door leaf attached to the door frame, then the whole design is installed in the opening in the wall. The perfect option, if the door is sold complete with the door frame and all marking and cuts are made in its manufacture at the factory using accurate stationary mechanisms.

The specialist remains only to gather into a single whole louting and the door canvas, strengthen the walls in the opening of the wall, then hang the door and consolidate the framing. When is it all better to do this: before repairing or after it?

When to put the doors when repairing: Nuances Installation

Scheme of the installation of interroom doors.

Opinions on this issue were divided. Some believe that in the process of restructuring, repairing or painting, the door canvas can suffer - to obtain mechanical damage, it can be fan of paint, scratched, so it must be put at the very end of repair or after it. Others think that the installation of interior doors can cause harm to just brake wallpaper, soup circular walls or sex, so it is better to put the design before repairing or during it.

Specialists in the field of construction are advised to carry out the door block only after all the main works are completed: the walls are finally aligned, put shtclothesia and plastering, work is completed with the ceiling design, floor aligned.

Article on the topic: Production of the rafter system with their own hands

After that, you can proceed to the next stage of repair - installation of interroom doors. But this work is not easy and needs a certain attention, patience, special skills and will not fail.

What should be considered when doors are put

When to put the doors when repairing: Nuances Installation

Diagram of the device of interroom doors.

When installing, you need to consider from what material the door block is made. If from the tree, the wood should be well succeeded - it will give the opportunity to avoid separation in the winter.

By the beginning of the installation of the door block, the host should be accurately navigated, which will be the floor in the room to take into account its height and correctly trim the doorway. It is necessary to take into account that after the flooring the floor is somewhat lifted, and this space needs to calculate in advance.

If you ignore the question when it is better to put the doors, before or after repair, and install them, for example, to the equipment of the draft floor and the end of plaster works, then in the future such a door can be deformed from humidity, as a result you have to install a new one.

Before putting the door, you need to decide on the height of its installation, since it is quite difficult to predict. There are requirements and to the walls: their verticality is obligatory. Otherwise, the delivered doors will visually perform from the plane against the background of curved walls, which will not decorate the room.

Measurement accuracy and other nuances

When to put the doors when repairing: Nuances Installation

Scheme for removing measurements for installing interroom door.

With regard to the interior door, each millimeter plays a huge role, because The slightest inaccuracy in measurements can spoil the purchased product. An important value has the right clearance between the web and the doorway. The gap should be from 3 to 5 mm. It should be borne in mind that the definition of the clearance depends on the material. For example, pine doors can swell, due to this clearance should be left somewhat larger. For metal plastic, you need a smaller gap, since the temperature difference on them is not reflected.

Article on the topic: How to get rid of fruit midges in the apartment

It also matters at what time of year is the installation of the door block. If the repair is made in winter, then when installing wooden doors it is necessary to leave a gap with a margin. In the summer, it is not advised to leave a big clearance because in the winter the door will be dried, as a result, it may deform.

The installation of the door block can be considered only after it adapts to the conditions of the apartment, to its humidity.

To put the doors during repairs are also permissible, but then you need to wrap them well with a packaging film or oil to protect against damage during other repairs.

When to put the doors when repairing: Nuances Installation

Mounting diagram of the door block.

Stucco and dust do not bear a big threat, but can hardly stain the door canvas.

Do not always do the doors are ideal in the openings. There are cases when the installation of doors is better done before repair. It may happen that the width of the door luttch does not match the width of the wall, then it will have to install good things. Often there are large gaps between the louting and the wall, which you have to bleed with construction foam, lure with the solution, after which the doorways will need to be plastered.

When mounting the door block, anchor screws and anchor plates are used, which can damage the wall, crush some part of it, which is undesirable if the repair has already been completed. This is another reason why the doors are better installed during repairs, and not after it.

Summarizing

Thus, an individual approach is needed to install the door, but in most cases it is still carried out at the end of repair. For convenient and correct installation you need:

  • carry out repairs in the summer;
  • take only a well-dried door;
  • Always make a gap between the web and the box;
  • When putting a gap, consider the material from which the door is made.

Article on the topic: Doors Gerda: Overview of steel entrance doors

Conclusion: Doors are an element of the room atmosphere and do not differ from the furniture. Therefore, you need to repair the walls, ceilings, gender, renovate or replace the windows and only then put the doors. In order not to damage them during other repair work, for example, pasting wallpaper or painting walls, you need to wind the doorbell with the film, and it is better to remove from the loops and remove to another room so that it does not absorb foreign moisture and construction dust, and finishing repair work - Hit.

Remember that with the door you need to handle it delicately, so it should be mounted at the end of the repair. This simple advice guarantees a beautiful interior and long service life to your doors.

Read more