How much drying the bulk floor under laminate and tile

Anonim

How much drying the bulk floor under laminate and tile

When planning work on the installation of floors during construction or repair, it is necessary to know not only the time required for the preparatory work and the device itself, but also how much does the bulk sex dries.

This is especially important in cases where the bulk gender is used as a coating, which then laid the main flooring. At the time of drying in bulk sex, very many circumstances are influenced, the understanding of which will allow you to fulfill the planned work qualitatively and on the planned time.

What depends on the time of the fuel drying

How much drying the bulk floor under laminate and tile

The thicker layer, the longer the floor dries

To account for the hardening time of the floor covering and planning subsequent work after its complete setting and dialing of strength and other indicators to design values, it is necessary to study the factors affecting this process.

The main one includes the following:

  • number of layers;
  • The thickness of each layer;
  • View of the mortar mixture for flooring;
  • type of main finish coating;
  • Applied to the coating device additives.

According to the average values, the dyeing time of the bulk can be from several hours to several days. On the package of each type of mixture, manufacturers indicate the approximate values ​​of this time.

Deadlines for solidification of flooring depending on the composition of the mixture

How much drying the bulk floor under laminate and tile

The drying time of the bulk floors depends, first of all, on the type of mixture used to perform the coating.

To understand how the composition of the mixture and the various additives applied to them are on the duration of solidification of bulk floors made with their help, it is necessary to consider some of them:

  1. Polymer floors used mainly in industrial production can dial the required strength for 2-6 days. Moreover, such various factors such as layer thicknesses and their quantity, the presence or absence of all kinds of additives, as well as various painting pigments can affect it.
  2. The floors made of cement-based compounds are finally clarified after 7-14 days, and the use of plasticizers used in them used to improve the mixture, can significantly increase these dates.

    How much drying the bulk floor under laminate and tile

    Polyurethane floors can be walking after 10 - 15 hours

  3. Gypsum or anhydride mixtures are collected for 2 days, after which it is possible to walk on the flooring, but they can only install the furniture on them and install the furniture in only 10 days at least. In addition, it is necessary to understand that the floors made of such mixtures cannot be performed in wet rooms, since under the action of water, they lose their strength.
  4. Fast-drying surfaces are performed from mixtures that can be seized for 2 hours, forming floors with high technical indicators.
  5. Polyurethane floors are suitable using the mixtures for which it is possible to walk after 10-15 hours, and after 3 days there are their complete hardening with the formation of a high-quality surface capable of withstanding high loads and sufficiently long time to maintain the required strength.
  6. Epoxy floors are frozen after 2-5 days depending on the number of layers, forming the surface very resistant to abrasion.

Using any mixture for the liquidate flooring, it is necessary to carefully examine the instructions for their use and perform the fill of the floors in full accordance with the specified technological sequence.

Strict compliance with the requirements of the instructions on the device in bulk floors will reduce the mixing time of the mixture and will ensure the performance of high-quality and reliable coating.

Depending on the type of finishing coating, the timing of solidification of the coating is distinguished.

Finish coatingType of solutionTime setting
LinoleumPolyurethane mixes3 days
LaminateGypsum, polymer3-7 days
TileCementUp to 2 weeks

After the fill, it is necessary to give the fields in time not least of the period in the package, and if possible, more than a few hours or days.

Conditions contributing to the speedy drying of bulk floors

In cases where the bulk sex is performed as a base under laminitis tile, carpet or other finishing coatings, it is often necessary to speed up the process of frozen coating. This is necessary in order not to delay the entire production process. Read more about bulk floors See this video:

How much driving the bulk floor under each specific type of coating is defined in the instructions on the packaging of the mixture. In addition, the following activities are performed:

  1. To quickly dry the bulk gender, it is necessary to monitor its uniform distribution over the surface.

    How much drying the bulk floor under laminate and tile

    Maximum loads Let's cover through as long as possible

  2. Moderate humidity (up to 60%) will provide rapid solidification of the base performed. If this humidity regime is non-compliance with the room, the duration of the grasp of bulk floors can last up to two weeks.
  3. In no case cannot be allowed in a room in a room where work is made, which can not only increase the detention of the coating, but also lead to the detachment of the entire coating or its individual parts from the base.
  4. The air temperature must be maintained from + 20 ° C to + 30 ° C, preventing sharp drops.
  5. The freshly added mixture must be covered with a polyethylene film to protect the surface against ultraviolet rays, under the action of which the surface can not only not reduce the timing of the setting, but also lose their main qualities.
  6. After a certain time, depending on the mixture used, which the floors were filling, the surface performed should be covered with varnish.
  7. The maximum load on the floors should be given as possible as possible to ensure a set of strength used for the floor-appliance. For the secrets of bulk sexes, see this video:

To ensure rapid setting of the mixture used in the device of bulk floors, it is necessary to provide for the creation in the room where work, favorable conditions are manufactured in accordance with the production technology of work and the instructions attached to the mixture.