According to the initial plan, it was supposed to produce water and use it exclusively for technical needs. There were no professional drillers, no one had been engaged in drilling and, therefore, it was the first experience in working with wells. It was lucky that we had a geologically very favorable place to bury the well, since a large number of springs beat.
With the help of the frame, it was determined suitable for drilling the place, then all the necessary calculations were made and the equipment was made, which was made from the existing primary materials, that is, what was in the house, it was used.
It was not possible to find a trim of a steel pipe having a large diameter, therefore, without thinking, we decided to use the pan from which the first boring was made. But the good rods made from water pipes.
How to drill a well into the water with your own hands?
It all started fine. The bur, having two legs, easily passed the clay layer, since clay consistency was like plasticine.
After ordinary clay, a layer of another clay, having a green-blue tint, and then went a layer of pure light sand, thickness about a meter. But after the sand, great difficulties began.
Then followed the sandstone layer, and scrolling the roar there was no possibility. After the first burden entered the sandstone, his teeth began to spine. To save the situation, a triangle was screwed to the boor, which was also sharpened, to burst sandstone. But it did not help and had to do the manufacture of a second bora.
Article on the topic: Emerald color in the interior
After a brief search, a plastic tube, having a diameter of 225 mm and the walls of centimeter thickness, was found. Made three petals from the old disk saw, and their cutting part was sharpened like a combine. After that, they screwed the corner and bolts screwed it to the edges of the pipe, after which the petals and guide drill were welded to this corner. I tried to drill, but quickly understood that they were rearranged with the angle, under which the petals were mounted, since the boring bought into the sandstone so much that it was impossible to turn it.
Having conducted a brainstorming, decided that the sandstone layer was needed by a smaller diameter so that the load on the shoulders decreased. We decided to take advantage of the fishing rumble, which moved the work from the dead point.
The stop decision was accepted when the rods ended. A pillar of water reached three meters.
Found a five-meter watering pipe in the household, drilled holes in it in such a way that the flushing of the filter grid turned out to be at least 5 cm.
The grid of stainless steel was purchased the smallest and wrapped around the pipe in two turns. The pipe was very tightly wrapped the grid so that it does not move and not slipped.
Then lowered the pipe in the previously dug cleaned pan.
The pipe is fixed with metallic rim and reinforcement. The pump is lowered and you can produce water.