Openwork pullover and tread

Anonim

Openwork pullover and tread

Another pretty openwork pullover bucket with beret. Knits knitting needles, it will be wonderful to look in the spring, while still cool. Stylish modelka, I liked it very extremely! I hope that you will call the appropriate feelings! Bug in pleasure!

Dimensions: 38/40 (42/44) 46/48 You will need: 950 (1050) 1150 g White yarn EXTRA Merino Big (100% sheep wool, 80 m / 50 g); Straight, circle, spokes and set of stocking spokes number 5.

Pullover knakes

Knit a gum, patterns A, B and D according to the relevant schemes on which only persons are given. r., V. R. Loops knit in the drawing, Nakida - ez.

Rubber: The number of loops is multiple 3 + 1 + 2 chrome. Knit according to the scheme 1. Start with 1 chrome, repeat the rapport A, finish the loop after the rapport A and 1 of the chrome. Repeat the 1st and 2nd r. In the circle, R.: In an odd circle. R. Repeat rapport A, in even circle. R. Loops knit in the drawing. Repeat the 1st and 2nd Circle. R.

Pattern A. (width 16 p.): Knit according to Scheme 1, repeat 1 time marked 16 p. repeat from the 1st to the 8th p.

Pattern B. (width 8 p.): Knit according to the scheme 2. Repeat from the 1st to the 4th p.

Pattern S. (width 17 p.): Knit according to Scheme 3, on which persons are given. and erased. R. Repeat from the 1st to the 12th r.

Pattern D. (width 16 p.): Knit as a pattern A, but to repeat from the 5th to the 12th r. The sequence of alternation of patterns (back and before): chr., O (6) 12 p. Elastic, with repeating rapport, 16 p. Pattern a, 8 p. Pattern in, 16 p. Pattern a, 17 p. Pattern C, 16 p. Pattern D. 8 p. Pattern in, 16 p. Patterns D, 0 (6) 12 p. Rubber bands, while starting with crossed n., Chrome.

Article on the topic: Medshound amigurumi. Description of knitting

Sequence of interlacing patterns (sleeves): Krom., 7 (10) 13 p. rubber bands, 8 p. Pattern in, 16 p. Pattern a, 8 p. Patterns B, 7 (10) 13 p. gum, chrome.

Knitting density: 20.5 p. And 24 r. = 10 x 10 cm.

Back / Before: Dial 99 (111) 123 p. and tie for a strip 8.5 cm = 20 p. rubber band; Then knit in the specified sequence. After 55 cm = 132 p. From the plank, the average 37 p. And both sides finish separately.

For rounding, close from the inside edge in every 2nd p. 1 x 4 and 3 x 2 p. After 58 cm = 140 p. From the plank, close for the shoulder bevels 10 (13) 16 p. and in the next 2nd p. 1 x 11 (14) 17 p. Finish work after 59 cm = 142 p. from the plank.

Sleeves: dial 48 (54) 60 p. and tie the bar as on the back; Then knit in the specified sequence. Simultaneously from the plank, add the sleeves from both sides alternately in each 4th and 2nd p. 16 (20) 28 x and in every 4th p. 8 (6) 0 x 1 p. = 96 (106) 116 p., Including the added loops into the rubber band. 36.5 cm = 88 p. From the plank, all loops close.

Assembly: perform shoulder seams; For a collar to dial on the circle, the knitting needles for the neckline from the inside of 132 p. and knit with a rubber band. At the collar height of 11.5 cm = 28 circle. R. All loops close in the drawing. Switch the sleeves, perform the side seams and seams of sleeves.

Takes knitting

Work description: dial 104 p. and tie 9 cm = 22 p. Rubber, repeating between chrome. Rapport A. In the latter. R. Evenly add 58 p. = 162 p. Then knit the pattern a, repeating between the chrome. Rapport V.

Article on the topic: Strawberry from candies with their own hands: Master class with photos and video

After 5 cm = 12 p. From the rubber band to perform a divergence according to Scheme 4, while starting with 1 chrome. And the loops before the rapport, repeat the rapport, end with loops after the rapport and 1 chrome.

After 18.5 cm = 44 p. From the gum to postpone the remaining 7 p. Perform the seams and on the pending 7 p. Tie 2 circles, p. Persons. Smooth (= knit faces.). Then pull these 7 p. Working thread.

Knitting schemes

Openwork pullover and tread

Openwork pullover and tread

Read more