Openwork Summer Pullover Crochet

Anonim

Openwork Summer Pullover Crochet
Openwork summer pullover crochet.

Size 40/42.

It will take: 300g lilac yarn (50% cotton, 50% polyacryl) Hook №3.5

Pattern with rhombuses: The number of Clause 31. Knit according to the scheme 1 circular P.1-th circular p. start with 1v.p. instead of the 1st Art. b / n., The following circular p. with star p. instead of the 1st Art. s / n. 1st, 2nd and 24th circular p. Finish 1Coad. Art., from the 3rd to the 23rd Circle. R. - 1st. b / n. in the 3rd century lift. Rapport loops repeat Braz, while the beginning of the circular p. Located in the 1st Rapporte, in the next rapports instead of the initial in. n. knit 1st. b / n. or 1st. s / n. And from the 3rd to the 23rd Circle, r. instead of art. b / n. Knit 1B. n. from the 1st to the 24th r. Perform 1 times.

Main pattern: Knit according to Scheme 2 direct and reverse r. Directly on the last circular r. Pattern with diamonds. Each row start with ZV. p. instead of the 1st Art. s / n. and n. before the rapport, 15 times repeat the p. Rapporta, finish p. after the rapport. From the 1st to the 3rd p. Run 1, then repeat the 2nd and 3rd r. In the text 2st. s / n. + 2V. p. + 2st. s / n. marked as a group of art. s / n. Pattern for the plank: knit according to the circuit 3 circular rows on the initial chain of the pattern with diamonds. 1st circular p. Start with 1B. p. instead of the 1st Art. b / n. and p. Before the rapport, the 2nd - 4th circular p. Start with ZV p. instead of the 1st Art. S / N., 22Productions to execute P. Rapporta and continue as indicated before the beginning of the circular p. C 1 - on the 4th circular p. Perform 1 times.

Click to enlarge

Openwork Summer Pullover Crochet

Openwork Summer Pullover Crochet

Attention! In all patterns, starting from the 2nd r. / Circular r., Groups from Art. s / n. knit in c. n. previous river / circular p.

Article on the topic: Knit an apple crochet. Scheme

Knitting density: Pattern with rhombuses: 1 Rapport in 1st circular p. = 14.5 cm in width, 1 Rapport in 24-m circular p. = 30cm in width, 7.5 circular p. = 10cm in height; The main pattern: 3.5 rapport (28p.) and 7p. = 10 × 1 osm.

Attention! Pullover knit circular rows, starting with the neck of the neck. Arrow on the pattern - direction of knitting.

Work description: Tie a chain from 186B. p. And to close it 1Coad. BUT . . Art. In the ring. Transition circular p.

Mark. It is on the right shoulder. Next knit pattern with rhombuses. Through 32cm = 24 circular p. From the beginning of work before and the back in Scheme 1 indicates the locations of the crossing for the initial art. s / n. and groups from Art. C / H 1st r. The main pattern, to tie to the end of the 2nd Rapport (= middle), from the middle of the p. Finish over the 3rd rapport of the pattern with diamonds symmetrically. 15.5 cm -11r. From the main pattern of the back to finish.

To transfer to knit over the 5th and 6th rapports of the pattern with diamonds as well. Unbounded edges of the pattern with rhombuses (1st and 4th rapport) -rukawa. For the calcine strip, the neck is consolidated in the middle of the neck of the neck of the back and knit the pattern for the plank, while in the 1st circular p. Above the triangles of the pattern with ripples knit 1st. b / n. In already bounded in. n. start of work and 1B. P. Skip, over 10 unremitted in. n. start of work, 1st century. P. Skip, 1st. b / n. In the following 8B. p. and 1v. P. Skip = total 114st. b / n. After 4cm - 4 circular p. Pattern for plank work to finish. Perform side seams.

Read more