Step-by-step installation of the air conditioner with your own hands (17 photos)

Anonim

Step-by-step installation of the air conditioner with your own hands (17 photos)

Step-by-step installation of the air conditioner with your own hands (17 photos)

If the heat attacked you, I'll show you and tell in pictures, how to correctly put the air conditioner)).

1. First attached the mounting plate on the wall. Fastening is made in terms of hung strictly horizontally. If it is not horizontally, the condensate formed in the block will not be poured into the street through the drainage canal and will fool you the whole wall.

Step-by-step installation of the air conditioner with your own hands (17 photos)

2. Marking under the hole in the wall. A bag of air conditioning is fixed slightly below, so as not to blur the wall when drilling.

Step-by-step installation of the air conditioner with your own hands (17 photos)

3. It is planned a hole for drilling and cut the wallpaper, so that when drilling them does not hurt them.

Step-by-step installation of the air conditioner with your own hands (17 photos)

4. The hole is drilled by a large perforator. In this case, the air conditioner is small, therefore drilling a bromide diameter of 34mm. Less labor and more neatly. In other cases, drilling a bromide with a diameter of 55mm.

Step-by-step installation of the air conditioner with your own hands (17 photos)

5. As you can see, after drilling there is not much dirt and dust, and the walls are clean.

Step-by-step installation of the air conditioner with your own hands (17 photos)

6. The brackets are placed and installed under the outer block.

Step-by-step installation of the air conditioner with your own hands (17 photos)

7. The track is prepared: two copper pipes of the corresponding diameter are dressed in special heat and moisture isolation called the thermoflex. In the beam, there is an inter-block connection cable for power transmission and signals from the indoor unit to the outer and vice versa. The track was wrapped in Teflon tape for easier passing through the hole in the wall, and in the future fewer damage from weather conditions.

Step-by-step installation of the air conditioner with your own hands (17 photos)

8. Finished track.

Step-by-step installation of the air conditioner with your own hands (17 photos)

9. The outer block is installed on the brackets and is fastened with 4 bolts to 13 with nuts and washers.

Step-by-step installation of the air conditioner with your own hands (17 photos)

10. While one fastens the block, the second wakes the closed track into the hole and sodes to connect to the outer block.

Step-by-step installation of the air conditioner with your own hands (17 photos)

11. Everything you need is connected to the outer block.

Step-by-step installation of the air conditioner with your own hands (17 photos)

12. We proceed to the inner block: connect the copper tubes to the block, connect the drainage tube in the block with our tube (16mm metal plastic) loosened to the wall to output drainage from the indoor unit. Connect the inter-block cable from outdoor to ext. block.

Article on the topic: Homemade outdoor and pendant lamps do it yourself in one style

Step-by-step installation of the air conditioner with your own hands (17 photos)

13. When the blocks are connected by copper tubes, proceed to vacuuming the contour. It is done to test the tightness and removal of moisture from the contour, as the moisture effectively affects the internal parts of the air conditioner, and first of all, the compressor and oil contained inside the block. A pressure gauge collector is connected by one end to the vacuum pump, and the other end to the service station on the outer unit of the air conditioner. You need to vacuum 10-20 minutes in dry weather.

Step-by-step installation of the air conditioner with your own hands (17 photos)

14. Vacuum pump itself. Of course two-stage))

Step-by-step installation of the air conditioner with your own hands (17 photos)

15. Fully connected and ready-to-use external unit of air conditioner.

Step-by-step installation of the air conditioner with your own hands (17 photos)

16. At the request of the customer, a special anti-vandal lattice is put on the outer block.

Step-by-step installation of the air conditioner with your own hands (17 photos)

17. The internal unit is installed and fully ready for operation.

Step-by-step installation of the air conditioner with your own hands (17 photos)

Read more