Ecopol - Gypsum Bulk Paul

Anonim

New developments in modern construction took a solid place due to their high environmental standards and operational characteristics. One of the similar new products is a gypsum filling floor.

This construction mixture includes only natural components that are used to create a screed. The main material of the finished mixture of Ecopol - Gypsum. It is widely used to create bulk outdoor surfaces.

Pluses of plaster floor

Ecopol - Gypsum Bulk Paul

Gypsum liquid sex is not afraid of high humidity, resistant to different mechanical effects and friction. The mixture does not require any pre-primer surface, special laid out of beacons and pulling. Ecopol dries very quickly and is a self-confined material.

The decision to use it as a basis for laminate or tile is the best low-cost repairs. This bulk floor can be used already in a day after the fill. The upper coating is laid on a gypsum surface in 5 days.

This type of screed today is widely used when finishing any indoor room. Moreover, the category of used premises also includes bathrooms and kitchens. Ecopol is not terrible increased air humidity and temperature difference.

The main advantages of the mixture:

  • high level of leveling coating;
  • a short duration of drying;
  • Easy and simple application technology.

The material enters the sale packaged in paper packs weighing 30 kg. Its storage can last up to 9 months. Detailed instructions for use are attached to the gypsum mixture.

Features of application

Ecopol - Gypsum Bulk Paul

The technique of performing a gypsum screed is quite simple and does not require certain skills. Previously, it is necessary to prepare the base base.

There are four ways to properly prepare:

  • Contact floor;
  • use of the separation layer;
  • base isolation;
  • Pouring under the warm floor.

Contact floor technology requires careful purification of the base fill in various pollution and dust. After the primer is applied for better adhesion of the base and the mixture. Gypsum spill floor flooded on the prepared surface. .

Article on the topic: Curtains on the loop: how to sew your own hands

In technology with separation, not a soil solution is used, but a special substrate as a paper. This rolled material covers the entire surface area. Paper strips need to apply 8 cm.

Another option to prepare for plaster fill is the use of an insulating base. An insulating material is put on the rolled paper. In this case, the primer is not used.

As for the screed under the warm floor, the Ecopol can easily be used under such a system. The gypsum mixture is well withstanding the temperature difference, but under the lining it is necessary to put high-quality waterproofing. After the warm floor system is mounted and a gypsum filling floor is performed.

Preparation of solution

Ecopol - Gypsum Bulk Paul

The Ecopol mixture is divorced by ordinary water according to the recommendations of the material manufacturer. Usually used 10 liters of liquid on 1 material package. Before use, the solution must be thoroughly stirred so that a homogeneous mass is obtained without lumps. It is best to use a special pump for this purpose.

It is very important to prevent the fluid in the solution. Otherwise, the strength of the material may decide and its shrinkage will increase. Also, with incorrectly cooked solution, the subsequent occurrence of cracks on the floor is possible.

Fill

The solution is starting to fill from a long corner. The screed must have a thickness that matches the desired level of mounted beacons. After the fill, the lighthouses are immediately removed, and the gaps are climbing. The solution should be evenly distributed over the entire area of ​​the brush. With the help of aluminum fixture, the gypsum spill floor is leveling.

Ecopol - Gypsum Bulk Paul

It is very important to apply a gypsum mixture quickly. The time spent time should not exceed 30 minutes - it is precisely for this period with a cooked solution. In no case cannot be used for the solution polluted water. Any dirt can reduce the exposure time of the mixture with the main surface, as well as to worsen the grasp of the material.

After applying the gypsum screed must dry well. Use the surface of the gypsum floor for walking can be throughout. But it is recommended to carry out further flooring on the screed, not earlier than a week after filling.

Article on the topic: Liquid wallpapers in the bathroom: Operating reviews

It is important to know that the gypsum mixture should be applied to the main surface only when the base temperature is not too low. Work must be carried out at a medium room temperature and medium humidity.

Modern gypsum mixture is one of the comfortable and simple embodiments of the screed. The material has high technical and operational characteristics. The floor of the gypsum mixture is well repelled moisture, does not miss pollution and has a long service life. Today, gypsum mixes for the fulfillment of a screed are greatly successful and become the most in demand.

Applying a screed does not require any specific techniques and may well be fulfilled independently. If for any reason to make a bulk surface does not seem to be possible, then it is better to trust the preparation of the solution and the technology of fulfilling the floor by a specialist.

Read more